Precast Detailing Case Study – Hospital Building Project, Australia
The double-wall project presented significant challenges, including input ambiguities, and coordination issues between disciplines. Modeling required precise representation of connections, reinforcement integration, and clash resolution, while detailing focused on accurate joint design, embedded elements, and tolerance adherence.
Facade Detailing Case Study – Pediatric Healthcare Building Project, USA
The Primary Children’s Hospital is a leading pediatric healthcare provider whose building’s design prioritizes both functionality and a comforting environment for children and their families.
Facade Detailing Case Study – Healthcare Facility Expansion Project, USA
RSF Berkley Hospital & MOB Expansion adding 200,000 square feet of new or renovated space to the existing 116,000-square-foot facility, significantly enhancing its healthcare services.
MEP BIM Case Study – Orthopedic Hospital Building Project, USA
The Hospital project involved Two floors. The scope of work required Advenser to create 3D HVAC model including all Services,
Scope:Modeling HVAC as per the design file provided.coordination with architectural & structural.providing shop drawings in plans with size, elevation, length, fixture tags, and dimensioning from grid lines.Advenser created models and drawings as per standards based on MEP design drawings. The project deliverables included Fabrication drawings and Shop drawings.
Architectural BIM Case Study – Dental Care Facility Project, USA
K C Dentistry for Kids, Gladstone facilitates with the Dental Care for Kids with high quality treatment process.This project was in BIM 360 and our scope includes the Model updates based on the Mark ups received.We have delivered the updated Model along with the sheets.
MEP BIM Case Study – Medical Facility, Iceland
Advenser provided detailed 3D modelling services for the New National Hospital, a state-of-the-art healthcare facility in Iceland.
Facade Detailing Case Study – Medical Complex, Canada
Advenser’s scope was to develop details and prepare shop drawings based on the conceptual design and specification using Alumicor profile system according to client requirement.
MEP BIM Case Study – Research Center USA
MEP BIM Case Study of an office building – Modeling of plumbing and electrical conduits from point cloud data.
MEP BIM Case Study – Healthcare Facility, USA
Fort Bliss hospital is a $1 billion advanced medical facility replacing the current William Beaumont Army Medical Center (WBAMC).
Architectural BIM Case Study – Healthcare Center Project, USA
The Project is a New Construction of Healthcare center where we have modeled and placed the dry wall framing members and ceiling framing members for co-ordination purposes. It is a LOD 300 model which includes such as Studs, Tracks and bracings support system. The Wall framing system are placed in certain Architectural standards.
MEP BIM Case Study – Chiller Plant for a Hospital Project, Canada
The Saint John hospital project was a scan to BIM project which involved in developing 3D model of mechanical, electrical, plumbing and fire protection systems inside the hospital chiller plant from point cloud scan data.