Steel Detailing Case Study – Industrial Material Handling Project, USA
The material handling system comprises four sorter platforms, four unloading platforms, three crossovers and one support grid platform.
Facade Detailing Case Study – Energy Plant Project, USA
The Fontaine Central Energy Plant, an approximately 19,000-square-foot building to provide thermal utilities to buildings within the Fontaine Research Park playing a key role in supporting the university’s infrastructure.
MEP BIM Case Study – Water Purification Plant Project, USA
Advenser provided process pipe modelling services in LOD 400 for a water purification project. Our scope included spool and BOM creation, shop drawing preparation, and generating as-built models.
Architectural BIM Case Study – Ware House Project, USA
Big Creek Foods Ware House with an area of 10,000 S.F, situated in Gainesville, Georgia, create customized turnkey pet programs, capable of producing and packaging a broad range of food products.
MEP BIM Case Study – Water Treatment Facility Project, USA
Advenser provided end-to-end MEP services for a water treatment plant project for Total Energy Management. Our scope included Mechanical, Electrical, Plumbing & Process pipe 3D modelling, coordination, shop drawings, and spool drawings for process pipes.
Precast Detailing Case Study – Factory & Warehouse Building, Australia
The project had a Factory & warehouse building with steel structure having façade covered with Precast wall panels 200 mm thick.
Precast Detailing Case Study – Industrial Development, Australia
Our task was to model and detail 300 wall panels using Tekla Structures software for an industrial building. The panels are 150 mm thick, and various types are included in the project such as solid panels, lintel panels, blade panels, finger panels, and retaining walls with precast slabs.
Steel Detailing Case Study – Material Handling Platforms, USA
The material handling system comprises of four sorter platforms, four unloading platforms, three crossovers and one support grid platform.
Steel Detailing Case Study – Micro Alloy Towers, USA
Nucor was upgrading their alloy additive batch-making process to a new automated system; this was done to help decrease the time it takes to make material grade changes and increase their overall throughput.
MEP BIM Case Study – Pumping Station, USA
LPPS is the largest finished water pumping station in the City of Philadelphia, conveying over 30% of the water consumed by the city on an average day.
Industrial BIM Case Study – Press Line Project, Germany
To develop a detailed 3D model of the facility using the RCP (Registered Point Cloud) data provided, incorporating all mechanical, structural, and electrical elements.
MEP BIM Case Study – Chiller Plant for a Hospital Project, Canada
The Saint John hospital project was a scan to BIM project which involved in developing 3D model of mechanical, electrical, plumbing and fire protection systems inside the hospital chiller plant from point cloud scan data.
BIM Services
Architectural
Structural
MEP
Facade
Industrial



