MEP BIM Case Study – Police Station Building Project, USA
The Upper Dublin project is involved in modeling and coordination of plumbing systems for a police building in the new Upper Dublin Township, Pennsylvania.The scope of work required Advenser to create 3D model of all plumbing services, carry out coordination with architecture, structure and other services, place pipe supports and create shop drawing as per client requirement.Advenser created models and drawings adhering to plumbing codes based on the design drawings. The project deliverables included 3D model, shop drawing and .NWD file ensuring flexibility for review, modification, and implementation.
Point Cloud BIM Case study – Police Station, Australia
Perth police station project required Advenser to develop an As-built BIM from the given point cloud data and the real images of the buildings.
Facade Detailing Case Study – Space Flight Center, USA
NASA’s Goddard Space Flight Center in Greenbelt, Maryland, is the nation’s largest organization of scientists, engineers, and technologists dedicated to space exploration and satellite research
MEP BIM Case Study – Defense and Security Building Project, USA
The Rebuild Sector/Station Key West Project is a critical infrastructure initiative focused on the renovation and reconstruction of the U.S.
BIM Services
Architectural
Structural
MEP
Facade
Industrial



