MEP BIM Case Study – Metro Station Project, Canada

MEP BIM Case Study – Metro Station Project, Canada

Advenser provided MEP services for four metro projects with Insight Technologies, including the notable Keelsdale Station. Our scope involved LOD 400 modelling, coordination, sleeve and hanger placement, and preparing detailed shop drawings.
Fabrication parts were used for accurate modelling, ensuring constructability and precision throughout the project.

MEP BIM Case Study – Mixed-Use Tower Project, USA

MEP BIM Case Study – Mixed-Use Tower Project, USA

The scope involved utilizing AutoCAD MEP to create precise electrical designs for prefabrication. This included calculating accurate wire cut lengths to reduce waste and ensure proper installation. Detailed drawings were developed to represent all components accurately, ensuring efficient assembly during the prefabrication process.

MEP BIM Case Study – Orthopedic Hospital Building Project, USA

MEP BIM Case Study – Orthopedic Hospital Building Project, USA

The Hospital project involved Two floors. The scope of work required Advenser to create 3D HVAC model including all Services,
Scope:Modeling HVAC as per the design file provided.coordination with architectural & structural.providing shop drawings in plans with size, elevation, length, fixture tags, and dimensioning from grid lines.Advenser created models and drawings as per standards based on MEP design drawings. The project deliverables included Fabrication drawings and Shop drawings.

MEP BIM Case Study – Data Center Project, Sweden

MEP BIM Case Study – Data Center Project, Sweden

Advenser provided comprehensive MEP services for the Microsoft GVX12 data center project in Sweden, executed for Priority Engineering, UK.Our scope included creating an LOD 400 model, spools, BOM, shop drawings, as-built documentation, and skids. The mechanical room posed significant challenges due to space constraints, requiring careful coordination and rearrangement of skids. The prefab steel-structured roof necessitated adding secondary metal supports for hangers, while refrigerant trays were rerouted in compliance with manufacturer standards.

MEP BIM Case Study – Transportation Infrastructure Project , USA

MEP BIM Case Study – Transportation Infrastructure Project , USA

The COLTS Transit Facility project is a transportation infrastructure project involved in the modeling and coordination of plumbing and lube piping services for a public transit system serving Lackawanna County, Pennsylvania. The scope of work required Advenser to create shop drawings for plumbing systems and lube piping using Revit 2020. This included performing clash detection and coordination with architectural, structural, mechanical, electrical, and fire sprinkler services throughout the facility, and generating Trimble field points to support the installation process. Advenser created fully coordinated models and drawings based on the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables included .RVT, .PDF, .DWG, .NWD, .TFL formats.

MEP BIM Case Study – Hotel Building Project, Cayman Islands

MEP BIM Case Study – Hotel Building Project, Cayman Islands

Advenser provided MEP modelling and coordination services for the 10-floor Hotel Indigo Grand Cayman project, developed by Decco Ltd for Dart Developments.The client required uniform services for all typical apartments, which demanded multiple model revisions to maintain consistency. The project used large Coolfit pipes for mechanical services, with 4″ pipes expanding to 8″ overall due to insulation. Routing and coordinating these oversized pipes with other trade services posed significant challenges.

MEP BIM Case Study – Sports Entertainment Facility, USA

MEP BIM Case Study – Sports Entertainment Facility, USA

The Top Golf Project is a sports entertainment venue involved in modeling and coordination of mechanical and plumbing systems for a new facility at King of Prussia Road, Pennsylvania. The project scope required Advenser to develop comprehensive, coordinated shop drawings for the mechanical and plumbing systems. Advenser delivered fully coordinated models, sleeve drawings and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including .DWG, .PDF, and .NWD files, ensuring flexibility for review, modification, and implementation

MEP BIM Case Study – Golf Club House Project, USA

MEP BIM Case Study – Golf Club House Project, USA

Arizona Biltmore golf club New clubhouse Project is a Hospitality & Entertainment initiative involved in modeling and coordination of mechanical and plumbing systems for a new facility at Biltmore Estates, located in Phoenix, Arizona. The project scope required Advenser to develop comprehensive, coordinated model/shop drawings for the mechanical and plumbing systems using AutoCAD MEP Fabrication. This process involved modeling and conducting thorough clash detection with the architectural, structural, and other building services across the entire facility. Advenser delivered fully coordinated models and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including.PDF, .DWG, and .NWD files, ensuring flexibility for review, modification, and implementation.

MEP BIM Case Study – Police Station Building Project, USA

MEP BIM Case Study – Police Station Building Project, USA

The Upper Dublin project is involved in modeling and coordination of plumbing systems for a police building in the new Upper Dublin Township, Pennsylvania.The scope of work required Advenser to create 3D model of all plumbing services, carry out coordination with architecture, structure and other services, place pipe supports and create shop drawing as per client requirement.Advenser created models and drawings adhering to plumbing codes based on the design drawings. The project deliverables included 3D model, shop drawing and .NWD file ensuring flexibility for review, modification, and implementation.

MEP BIM Case Study – College Building Project, USA

MEP BIM Case Study – College Building Project, USA

The Stem Center Project is an educational initiative involved in modeling and coordination of mechanical and plumbing systems for a new facility at Gulf Coast State College, located in Panama City, Florida. The project scope required Advenser to develop comprehensive, coordinated shop drawings for the mechanical and plumbing systems using Revit 2021. This process involved modeling and conducting thorough clash detection with the architectural, structural, and other building services across the entire facility.Advenser delivered fully coordinated models and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including .RVT, .PDF, .DWG, and .NWD files, ensuring flexibility for review, modification, and implementation.

MEP BIM Case Study – Water Treatment Facility Project, USA

MEP BIM Case Study – Water Treatment Facility Project, USA

Advenser provided end-to-end MEP services for a water treatment plant project for Total Energy Management. Our scope included Mechanical, Electrical, Plumbing & Process pipe 3D modelling, coordination, shop drawings, and spool drawings for process pipes.

Get a Quote