By Advenser | Jul 28, 2025 | Uncategorized
Advenser provided MEP services for four metro projects with Insight Technologies, including the notable Keelsdale Station. Our scope involved LOD 400 modelling, coordination, sleeve and hanger placement, and preparing detailed shop drawings.
Fabrication parts were used for accurate modelling, ensuring constructability and precision throughout the project.
By Advenser | Jul 25, 2025 | Uncategorized
Advenser provided Mechanical, Electrical & Plumbing modelling, coordination, and shop drawing services for 90 Nexus, a 10-floor mixed-use building with a roof, developed by Dart in the Cayman Islands.
By Advenser | Jul 25, 2025 | Uncategorized
The scope involved utilizing AutoCAD MEP to create precise electrical designs for prefabrication. This included calculating accurate wire cut lengths to reduce waste and ensure proper installation. Detailed drawings were developed to represent all components accurately, ensuring efficient assembly during the prefabrication process.
By Advenser | Jul 25, 2025 | Uncategorized
Advenser was engaged by Pitt Meadows Plumbing & Mechanical Systems Ltd to provide plumbing modelling services for Oakridge Towers in Vancouver, Canada.
By Advenser | Jul 25, 2025 | Uncategorized
The Hospital project involved Two floors. The scope of work required Advenser to create 3D HVAC model including all Services,
Scope:Modeling HVAC as per the design file provided.coordination with architectural & structural.providing shop drawings in plans with size, elevation, length, fixture tags, and dimensioning from grid lines.Advenser created models and drawings as per standards based on MEP design drawings. The project deliverables included Fabrication drawings and Shop drawings.
By Advenser | Jul 25, 2025 | Uncategorized
Advenser provided comprehensive MEP services for the Microsoft GVX12 data center project in Sweden, executed for Priority Engineering, UK.Our scope included creating an LOD 400 model, spools, BOM, shop drawings, as-built documentation, and skids. The mechanical room posed significant challenges due to space constraints, requiring careful coordination and rearrangement of skids. The prefab steel-structured roof necessitated adding secondary metal supports for hangers, while refrigerant trays were rerouted in compliance with manufacturer standards.
By Advenser | Jul 25, 2025 | Uncategorized
The COLTS Transit Facility project is a transportation infrastructure project involved in the modeling and coordination of plumbing and lube piping services for a public transit system serving Lackawanna County, Pennsylvania. The scope of work required Advenser to create shop drawings for plumbing systems and lube piping using Revit 2020. This included performing clash detection and coordination with architectural, structural, mechanical, electrical, and fire sprinkler services throughout the facility, and generating Trimble field points to support the installation process. Advenser created fully coordinated models and drawings based on the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables included .RVT, .PDF, .DWG, .NWD, .TFL formats.
By Advenser | Jul 25, 2025 | Uncategorized
Advenser provided MEP modelling and coordination services for the 10-floor Hotel Indigo Grand Cayman project, developed by Decco Ltd for Dart Developments.The client required uniform services for all typical apartments, which demanded multiple model revisions to maintain consistency. The project used large Coolfit pipes for mechanical services, with 4″ pipes expanding to 8″ overall due to insulation. Routing and coordinating these oversized pipes with other trade services posed significant challenges.
By Advenser | Jul 25, 2025 | Uncategorized
The Top Golf Project is a sports entertainment venue involved in modeling and coordination of mechanical and plumbing systems for a new facility at King of Prussia Road, Pennsylvania. The project scope required Advenser to develop comprehensive, coordinated shop drawings for the mechanical and plumbing systems. Advenser delivered fully coordinated models, sleeve drawings and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including .DWG, .PDF, and .NWD files, ensuring flexibility for review, modification, and implementation
By Advenser | Jul 25, 2025 | Uncategorized
Arizona Biltmore golf club New clubhouse Project is a Hospitality & Entertainment initiative involved in modeling and coordination of mechanical and plumbing systems for a new facility at Biltmore Estates, located in Phoenix, Arizona. The project scope required Advenser to develop comprehensive, coordinated model/shop drawings for the mechanical and plumbing systems using AutoCAD MEP Fabrication. This process involved modeling and conducting thorough clash detection with the architectural, structural, and other building services across the entire facility. Advenser delivered fully coordinated models and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including.PDF, .DWG, and .NWD files, ensuring flexibility for review, modification, and implementation.
By Advenser | Jul 25, 2025 | Uncategorized
The Upper Dublin project is involved in modeling and coordination of plumbing systems for a police building in the new Upper Dublin Township, Pennsylvania.The scope of work required Advenser to create 3D model of all plumbing services, carry out coordination with architecture, structure and other services, place pipe supports and create shop drawing as per client requirement.Advenser created models and drawings adhering to plumbing codes based on the design drawings. The project deliverables included 3D model, shop drawing and .NWD file ensuring flexibility for review, modification, and implementation.
By Advenser | Jul 23, 2025 | Uncategorized
The Stem Center Project is an educational initiative involved in modeling and coordination of mechanical and plumbing systems for a new facility at Gulf Coast State College, located in Panama City, Florida. The project scope required Advenser to develop comprehensive, coordinated shop drawings for the mechanical and plumbing systems using Revit 2021. This process involved modeling and conducting thorough clash detection with the architectural, structural, and other building services across the entire facility.Advenser delivered fully coordinated models and detailed shop drawings by leveraging the provided architectural and structural 3D models, ensuring compliance with industry standards and the client’s requirements. The project deliverables were provided in various formats, including .RVT, .PDF, .DWG, and .NWD files, ensuring flexibility for review, modification, and implementation.
By Advenser | Jul 23, 2025 | Uncategorized
Advenser provided detailed 3D modelling services for the New National Hospital, a state-of-the-art healthcare facility in Iceland.
By Advenser | Jul 23, 2025 | Uncategorized
Advenser provided process pipe modelling services in LOD 400 for a water purification project. Our scope included spool and BOM creation, shop drawing preparation, and generating as-built models.
By Advenser | Jul 22, 2025 | Uncategorized
Advenser provided detailed 3D modelling services for the extension work of Radnor high school, Radnor, PA 19087
By Advenser | Jul 21, 2025 | Uncategorized
Mckinney Municipal Complex is a government building project which involved in modeling and coordination of mechanical and plumbing systems for a new facility located in Mckinney, Texas.
By Advenser | Jul 21, 2025 | Uncategorized
Advenser provided end-to-end MEP services for a water treatment plant project for Total Energy Management. Our scope included Mechanical, Electrical, Plumbing & Process pipe 3D modelling, coordination, shop drawings, and spool drawings for process pipes.
By Advenser | Jun 21, 2025 | Uncategorized
MEP BIM Case Study of an office building – Modeling of plumbing and electrical conduits from point cloud data.
By Advenser | Jun 21, 2025 | Uncategorized
This project involved the addition of a 71,150 sq. ft. second annex to Coastal Carolina’s current Science Building which was constructed in 1980.
By Advenser | Jun 21, 2025 | Uncategorized
In Google Kirkland campus, located in Washington, a new 2 story office building was proposed to suit existing office building over one level of structured parking.
By Advenser | Jun 21, 2025 | Uncategorized
Fort Bliss hospital is a $1 billion advanced medical facility replacing the current William Beaumont Army Medical Center (WBAMC).
By Advenser | Jun 21, 2025 | Uncategorized
The Honda-Toyota facility project in Seattle covering an area of 480,000 sq. feet required Advenser to model, coordinate and use this model for all other future showrooms.
By Advenser | Jun 20, 2025 | Uncategorized
LPPS is the largest finished water pumping station in the City of Philadelphia, conveying over 30% of the water consumed by the city on an average day.
By Advenser | Jun 20, 2025 | Uncategorized
We had to deliver Revit families of hanger components and seismic hangers as per the catalogue information and equipment list provided in excel format.
By Advenser | Jun 20, 2025 | Uncategorized
This construction project involved a 150,000 sq. ft. residential and commercial building including 140 multi-family dwelling units with 15% MPDUs as well as 7,000 square feet of retail space along the Arlington Road property frontage.
By Advenser | Jun 11, 2025 | Uncategorized
The Rebuild Sector/Station Key West Project is a critical infrastructure initiative focused on the renovation and reconstruction of the U.S.
By Advenser | May 16, 2025 | Uncategorized
The Saint John hospital project was a scan to BIM project which involved in developing 3D model of mechanical, electrical, plumbing and fire protection systems inside the hospital chiller plant from point cloud scan data.