MEP BIM Case Study – Research Center USA
Project Information
Sector:
Healthcare
Project Type:
Laboratory & Research Center
Location:
USA
Deliverables:
BIM Model
Services:
HVAC Pipe & Electrical
Software:
Revit-2014, Recap
Our scope of services
200 Sidney St, located in Fort Washington Research Center is a 4 story laboratory & office building constructed in the year 2000 and, currently it is under renovation for new tenants. A major renovation work was planned in case of HVAC ducts.
Our objective was to convert the 3D scanned point cloud data of hydronic and plumbing pipes as well as conduits in the Mechanical room into an intelligent BIM with LOD 300 in order to study the impact of new clashes and reworks required on other services as a result of changes in ducts. The final deliverable submitted by Advenser was an As-built model of mechanical room pipes and conduits complete with supports, hangers, and equipment for coordination purposes with redesigned ducts.
BIM Services
Architectural
Structural
MEP
Facade
Industrial


