MEP BIM Case Study – Mixed-Use Tower Project, USA
Project Information
Sector:
Commercial
Project Type:
Mixed-use Tower
Location:
USA
Deliverables:
CAD & PDF
Services:
Electrical Prefabrication Drawings
Software:
AutoCAD MEP & MS Excel
Our scope of services
The scope involved utilizing AutoCAD MEP to create precise electrical designs for prefabrication. This included calculating accurate wire cut lengths to reduce waste and ensure proper installation. Detailed drawings were developed to represent all components accurately, ensuring efficient assembly during the prefabrication process. The final deliverables included prefabrication drawings with specified wire lengths, device labels, and component placements, providing clear instructions for the installation team. These drawings aim to streamline the electrical installation process, improving accuracy and minimizing on-site adjustments.
BIM Services
Architectural
Structural
MEP
Facade
Industrial



