Select Page

MEP BIM Case Study – Mixed-Use Tower Project, USA

MEP BIM for Mixed-Use Tower Project

Project Information

Sector:

Commercial

Project Type:

Mixed-use Tower

Location:

USA

Deliverables:

CAD & PDF

Services:

Electrical Prefabrication Drawings

Software:

AutoCAD MEP & MS Excel

Our scope of services

The scope involved utilizing AutoCAD MEP to create precise electrical designs for prefabrication. This included calculating accurate wire cut lengths to reduce waste and ensure proper installation. Detailed drawings were developed to represent all components accurately, ensuring efficient assembly during the prefabrication process. The final deliverables included prefabrication drawings with specified wire lengths, device labels, and component placements, providing clear instructions for the installation team. These drawings aim to streamline the electrical installation process, improving accuracy and minimizing on-site adjustments.

Project Models

Partner With Advenser and Take Your Project to the Next Level

Get a Quote