Select Page

MEP BIM Case Study – High School Building Project, USA

MEP BIM for High School Building Project

Project Information

Sector:

Institutional

Project Type:

High School

Location:

USA

Deliverables:

Revit model and Shop drawing

Services:

HVAC duct, Mechanical Pipe Modelling and Shop Drawings

Software:

Revit

Our scope of services

Advenser provided detailed 3D modelling services for the extension work of Radnor high school, Radnor, PA 19087 The scope of this project involved comprehensive HVAC duct and mechanical pipe modelling, as well as preparing detailed shop drawings. Our team was responsible for Developing precise 3D models of the HVAC duct systems, ensuring proper airflow distribution across the building. Addressing space constraints and coordination challenges by optimizing duct routes to minimize clashes with other building services. Creating accurate models for mechanical piping systems. Ensuring alignment with design specifications and maintaining efficiency in layout for seamless installation. Delivered high quality models and drawings that adhered to project standards and client expectations.

Project Models

Partner With Advenser and Take Your Project to the Next Level

Get a Quote