MEP BIM Case study
Ft. Bliss Clinics
Project Information
Building Type: Hospital
Location: : El Paso, Texas, USA
Inputs: MEP Design drawings
Deliverables: BIM Shop drawings
Software: AutoCAD MEP 2014
Services: HVAC Duct, pipe, Plumbing
Introduction
Fort Bliss hospital is a $1 billion advanced medical facility replacing the current William Beaumont Army Medical Center (WBAMC).
Our scope of work
The scope of work for Advenser was to model and coordinate the clinical buildings which have a total area of 500,000 sq. feet. Advenser delivered MEP models using AutoCAD MEP along with coordination and clash detection, which were carried out using Navisworks Manage. The design inputs were in cad and pdf format which Advenser converted into 3D for co-ordination. Architectural, structural inputs 3D format were also received other than MEP for coordination purpose.
Business Model Adopted
Man-month business model was used for the initial phase of the project for over a period of 4 months whereas an hourly billing model was adopted for the additional hours in the second phase.
Challenges
The queries/assumptions were prepared as issues or FRIs and submitted for the client approval. Issues were tracked through the client’s project management interface.
Solutions
Advenser’s final deliverables included generating the coordinated set of drawings and submitting the same in dwg and pdf formats.