MEP BIM Case Study

Ft. Bliss Clinics

MEP BIM Services done for hospital building at El Paso, Texas by Advenser

Project Information

Building Type: Hospital

Location: : El Paso, Texas, USA

Inputs: MEP Design drawings

Deliverables: BIM Shop drawings

Software: AutoCAD MEP 2014

Services: HVAC Duct, pipe, Plumbing

Introduction

Fort Bliss hospital is a $1 billion advanced medical facility replacing the current William Beaumont Army Medical Center (WBAMC).

Our scope of work

The scope of work for Advenser was to model and coordinate the clinical buildings which have a total area of 500,000 sq. feet. Advenser delivered MEP models using AutoCAD MEP along with coordination and clash detection, which were carried out using Navisworks Manage. The design inputs were in cad and pdf format which Advenser converted into 3D for co-ordination. Architectural, structural inputs 3D format were also received other than MEP for coordination purpose.

Business Model Adopted

Man-month business model was used for the initial phase of the project for over a period of 4 months whereas an hourly billing model was adopted for the additional hours in the second phase.

Challenges

The queries/assumptions were prepared as issues or FRIs and submitted for the client approval. Issues were tracked through the client’s project management interface.

Solutions

Advenser’s final deliverables included generating the coordinated set of drawings and submitting the same in dwg and pdf formats.

MEP BIM Services done for a hospital in texas by Advenser
MEP BIM Services for Hospital in texas done by Advenser
Get a Quote